While the outside work is underway, we work on improving the basement. The laundry USED to be in the middle of the ‘shop’. Since starting this endeavor we have built a wall in the basement (the kids helped!)
It took several weekends to get the frame and a very simple plywood paneling in place.
In one weekend Scott & Heather shortened two doors, built from scratch the door frames and mounted them both. It was very satisfying.
We moved the dryer and re-ran the duct-work, first time we actually used ‘duct’ tape for ducting! We built a washer/dryer stand so the front load washer sits higher off the ground and is next to the dryer for easy transfer.
The laundry room is a huge improvement to clothes (clean & dirty) covered in sawdust and the bunnies are enjoying their new home on the other sides of the stairs in the ‘storage’ room. Eventually that room may even be a basement lair of sorts (gaming, homework, etc.) but for now it’s storage, storage, bunnies, and more storage.
Scott added a bandsaw to his set of shop tools, he still needs a jointer (and probably a newer table saw) before he can truly focus on building the door. He did build a ‘scrap cart’ to get the old oak flooring out of the way. I must say moving everything around in the shop sure makes it hard to find all the things you used to know where they were…